Exhibition stand built by Power Media at a Dubai trade showLet's Discuss
your project

ADIPEC 2026 Exhibition Stands

2–5 November 2026 at ADNEC Centre Abu Dhabi. We design, build and install the stand in Abu Dhabi, and print every graphic on it.

 days to go
📅 2–5 November 2026📍 ADNEC Centre Abu Dhabi

Dates

2–5 November 2026

Venue

ADNEC Centre Abu Dhabi, Abu Dhabi

Organiser

dmg events

Edition

2026 edition

What is ADIPEC 2026?

ADIPEC 2026 is the Abu Dhabi International Petroleum Exhibition and Conference. It runs from 2 to 5 November 2026 at ADNEC Centre Abu Dhabi and is organised by dmg events. The organiser reports more than 239,000 exhibition attendees and over 2,250 exhibiting companies.

Dates, zones and figures below come from the organiser, dmg events. Official show website.

239,000+attendees
2,250+exhibiting companies
1,800+conference speakers
54national and international oil companies

Inside ADIPEC 2026

What the show is, who runs it and what else happens that week.

ADIPEC is the largest energy event in the region and one of the largest in the world. The floor covers the whole energy value chain, from drilling and subsurface to low carbon and chemicals.

Stands here are big, and they are judged against the national oil companies. Build quality, hospitality space and a clear equipment story matter more than square metres alone.

The show is in Abu Dhabi, so transport, access passes and build-up timing need planning from Dubai or Sharjah. We allow the extra day.

Running alongside the show

  • AI Zone — Dedicated zone within the exhibition
  • Low Carbon and Chemicals Zone — Dedicated zone within the exhibition
  • Digitalisation Zone — Dedicated zone within the exhibition
  • Maritime and Logistics Zone — Dedicated zone within the exhibition
Custom exhibition stand with lounge seating and backlit branding

Who Exhibits at ADIPEC

The halls are grouped by sector. Find yours, then plan the stand around the buyer who walks it.

Drilling and subsurface

Rigs, drilling tools, downhole equipment and services.

Offshore and marine

Vessels, subsea systems, moorings and offshore services.

Valves, flow and pipelines

Valves, pumps, fittings, pipes and integrity services.

Digitalisation and AI

Industrial software, sensors, monitoring and analytics.

Low carbon and chemicals

Hydrogen, carbon capture, catalysts and petrochemicals.

Maritime and logistics

Port services, freight, supply chain and handling.

Safety and industrial services

PPE, fire protection, inspection and maintenance.

Engineering and EPC

Contractors, consultancies and project services.

Exhibiting at ADIPEC 2026?

Send your hall and stand size. You get a design approach and an itemised quote back.

WhatsApp us

Who you will meet on the floor

  • National and international oil company engineering teams
  • Procurement and supply chain leads for major operators
  • EPC contractors and their subcontractors
  • Ministers, delegations and investors from energy markets

Why Exhibit at ADIPEC?

  1. The biggest energy audience in the region dmg events reports more than 239,000 attendees, so your buyers are on the floor whether you are or not.
  2. Operator access 54 national and international oil companies take part, and their engineers walk the halls looking for approved suppliers.
  3. Deals, not leads Contracts get discussed on ADIPEC stands. Meeting rooms and hospitality space earn their floor area here.
  4. Zoned floor AI, low carbon, digitalisation and maritime each have their own zone, so buyers find you faster if you are placed well.

What to Show on Your Stand

What works on this floor, from stands we have built for shows at this venue.

Real equipment

Cut-away valves, sample joints and working models beat any render.

A meeting room

ADIPEC business happens seated and often behind a closed door.

Hospitality

A coffee point keeps visiting delegations on your stand longer.

Your approvals, visible

API, ISO and operator approvals are checked before price at this show.

Screens with live data

Show monitoring dashboards or process animations running, not looping stills.

A branded high structure

Hanging banners and tall towers are how stands get found in the big halls.

Stand Types at ADIPEC

Four ways to take the space, and what each one involves.

Stand typeBest forWhat it involves
Shell scheme dressingA first stand, or a tight budgetThe organiser supplies the walls. We add printed graphics, a fascia, lighting, flooring and furniture.
Custom space-only standBrands who want to be seen down the aisleBare floor, built from scratch in our Sharjah unit. Drawings go to the organiser and the venue for approval before build-up, and we allow extra transport time to Abu Dhabi.
Double-decker standBig teams who need private meeting roomsA second level for meetings and hospitality. Structural drawings and approval take longer, so start early.
Modular or rental standRepeat exhibitors and short lead timesA reusable frame with fresh graphics each year. Lower cost per show and quicker to install.

← Swipe the table sideways to see all columns →

Double-storey custom exhibition stand built by Power Media in the UAE

What Exhibitors Order Most

Everything below is made in our own unit in Sharjah, so one team handles the whole stand.

Joinery works

Counters, storage, display plinths and meeting furniture built to fit your stand plan.

LED screens

Screens and video walls for product loops and live demos, hired or supplied for the show days.

Hoisting flags and fabric graphics

Teardrop and hoisting flags outside the hall, table-top flags on the meeting table and tension-fabric backwalls behind the stand.

Digital fabric printing

Seamless printed backdrops, fabric counters and hanging banners that pack flat and fly cheap.

Signage printing

Fascia boards, hanging signs, directional graphics and floor vinyl.

Event and production rental

Furniture, staging, lighting and AV hired for the show days instead of bought.

Your Build Timeline

Work back from the first day of build-up.

ADIPEC 2026 is at ADNEC Centre Abu Dhabi. Custom stands need the organiser’s approval and the venue’s contractor registration before build-up. We handle those submissions for you.

  1. As soon as you book spaceSend us the hall, stand number and size. We confirm what that stand type allows.
  2. 10 to 12 weeks beforeConcept and 3D design, so you approve the look before detailed pricing.
  3. 8 weeks beforeFinal drawings, structural calculations and the stand submission to the organiser.
  4. 4 weeks beforeArtwork deadline. Graphics go to print and long-lead items are ordered.
  5. Build-up daysWe install, dress and clean the stand, then hand it over ready for day one.

Exhibiting at ADIPEC 2026?

Send your hall, stand number and size. You get a design approach, a timeline that fits the organiser’s deadlines and an itemised quotation.

ADIPEC 2026 FAQs

When and where is ADIPEC 2026?

ADIPEC 2026 runs from 2 to 5 November 2026 at ADNEC Centre Abu Dhabi.

Who organises ADIPEC?

dmg events.

How big is ADIPEC?

The organiser reports more than 239,000 exhibition attendees, over 2,250 exhibiting companies and 1,800 plus conference speakers.

Which industries exhibit at ADIPEC?

Drilling and subsurface, offshore and marine, valves and pipelines, digitalisation and AI, low carbon and chemicals, maritime and logistics, safety, and engineering contractors.

What are the ADIPEC zones?

The exhibition includes an AI Zone, a Low Carbon and Chemicals Zone, a Digitalisation Zone and a Maritime and Logistics Zone.

Can a Dubai stand builder work at ADNEC in Abu Dhabi?

Yes. We build in our own unit in Sharjah and install at ADNEC. We allow extra transport and access time for Abu Dhabi build-up.

What stand types work at ADIPEC?

Most exhibitors take space-only and build custom, often double-decker for meeting rooms. Shell scheme dressing suits smaller suppliers and country pavilions.

When should I brief a stand builder for ADIPEC?

Twelve weeks or more for a large custom or double-decker stand, because drawings and approvals take longer at this scale.

Can you handle heavy equipment on the stand?

Yes. Tell us the weight and footprint early so the floor loading and lifting are planned with the venue.

What does an ADIPEC stand cost?

It depends on floor size, stand type, the amount of joinery and whether you need a second level. Send your hall, stand number and size for an itemised quotation.